top of page
Newcastle drawing bridge and terrace

 /  PLANNING DRAWING NEWCASTLE UPON TYNE

YOUR HOME PROPERLY DRAWN.
FIVE DAYS.

Planning drawings for house extensions, loft conversions and garage conversions across Newcastle upon Tyne and the North East. Measured on site. Fixed price. Council-ready.

Fixed price from £450· Response within 24 hours · No obligation

Newcastle Monument drawing

 /  WHAT WE DO IN NEWCASTLE

FOUR SERVICES.
ONE SPECIALIST.

Most common

House Extension Drawings

Rear extensions, side returns, double-storey additions. We prepare the full planning drawing package for your Newcastle home — floor plans, elevations, site plan. Everything your council needs, nothing missing.

Often permitted development

Garage Conversion Drawings

Turn an unused garage into a home office, studio or bedroom. Most Newcastle garage conversions fall under Permitted Development — we confirm your planning route before any drawings are prepared.

Usually needs planning

Loft Conversion Drawings

Dormer, hip-to-gable or Velux. Newcastle's Victorian terraces and Edwardian semis are built for loft conversions — we prepare drawings that reflect your actual roof structure, not a template.

All projects

Planning Application Drawings

Need a full householder planning application drawing package? We prepare everything Newcastle City Council requires — location plan, block plan, elevations, floor plans and planning statement.

 /  PLANNING  DRAWINGS IN NEWCASTLE UPON TYNE

HOUSEHOLDER PLANNING IN NEWCASTLE

A householder planning application to Newcastle City Council covers most residential projects — rear extensions, side extensions, loft conversions with dormers, and garage conversions that change the external appearance of a property. The application requires a complete drawing package: existing and proposed floor plans, front, rear and side elevations, a site location plan prepared to OS standards at 1:1250, and a block plan at 1:500.

Not every project requires a full application. Extensions under certain dimensions, Velux loft conversions and many integral garage conversions fall under Permitted Development rights. Conservation areas across Newcastle — including parts of Jesmond, Gosforth and the City Centre — often remove Permitted Development rights entirely, requiring a formal application regardless of project size.

Once drawings are submitted via the Planning Portal, Newcastle City Council typically processes householder applications within 8 weeks of a valid submission. Incomplete or inaccurate drawings are the most common reason applications are delayed or invalidated on receipt. We prepare drawings to the exact standard NCC expects — to scale, correctly labelled, and complete on day one.

For projects under Permitted Development, building regulations drawings are still required before construction begins — covering structural details, insulation, fire safety and drainage. We prepare planning drawings; building regulations require a structural engineer or approved inspector alongside our work.

Every drawing set starts with a site visit to your property. Drawings prepared from photos, estate agent floor plans or rough sketches are a consistent source of planning queries and refusals. Accurate measurements from your actual building are the foundation of every set of plans we deliver.

Saint James Park drawing

 /  WHY NEWCASTLE HOMEOWNERS CHOOSE US

NOT AN AGENCY
NOT A QUEUE.

       Most planning drawing services in Newcastle put you in a queue. Six weeks. Eight weeks. "We'll get back to you." We don't work like that. Your project gets a fixed price within 24 hours and drawings within 5 working days — because that's what homeowners in Newcastle actually need.

       Every set of drawings is based on accurate measurements taken at your property. Not copied from a template. Not scaled from a photo. From your actual building.

Measured on site — every time

       We visit your property across Newcastle and the North East to take accurate measurements. Drawings prepared from photos or sketches are the most common reason planning applications are queried or refused.

Fixed price, confirmed before we start

       No hourly rates. No "we'll see how complex it gets." You get a confirmed quote before any work begins — and the final bill matches it.

Newcastle City Council knowledge

       We prepare drawings to NCC's exact requirements — including conservation area rules, Article 4 directions, and local authority standards that generic services miss.

Direct communication throughout

       You deal with the engineer preparing your drawings from first contact to delivery. No handoffs, no account managers, no chasing updates.

 /  COVERAGE ACROSS NEWCASTLE AND THE NORTH EAST

WE KNOW
NEWCASTLE.

From Victorian terraces in Heaton to Edwardian semis in Gosforth, from Tyneside flats in Wallsend to detached houses in Benton — every Newcastle property type comes with its own planning considerations. We understand what Newcastle City Council, Gateshead Council and North Tyneside Council each expect, and prepare drawings accordingly.

Gosforth

Semi-detached & detached

North Tyneside

Coastal & suburban

Jesmond

Victorian & Edwardian

Whitley Bay

Seafront & residential

Heaton

Terraced & semi

South Tyneside

Terraced & modern

Benton

Family homes

Ponteland

Detached & rural

Wallsend

Tyneside flats

Cramlington

Modern estates

Gateshead

All property types

Northumberland

Wider coverage

 /  HOW IT WORKS

FOUR STEPS.
NO SURPRISES.

Send your brief

Describe your project — extension type, property address, rough idea of what you need. No drawings required at this stage.

Fixed quote within 24 hours

We confirm your planning route and give you a fixed price. No hourly rates. No "it depends." One number, confirmed upfront.

Site visit across Newcastle

We visit your property to take accurate measurements. Your drawings are based on your actual building — not generic templates or photos.

Drawings in 5 working days

Your complete drawing package is delivered within 5 working days of the site visit. Ready to submit to Newcastle City Council via the Planning Portal.

 /  COMMON QUESTIONS

STRAIGHT.
ANSWERS.

Do I need planning permission for an extension in Newcastle?

Not always. Single-storey rear extensions under 4m (detached) or 3m (semi/terraced) often fall under Permitted Development. Double-storey extensions, side extensions, and any project in a Newcastle conservation area require a full householder planning application.

How long do planning drawings take?

5 working days from the site visit. The clock starts after the visit and deposit — not after your first enquiry. Standard projects — rear extensions, loft conversions, garage conversions — all within that window.

Do you cover Gateshead and North Tyneside?

Yes. We prepare planning drawings across Newcastle City, Gateshead, North Tyneside and South Tyneside — each to the specific council's requirements for your property.

What's included in a planning drawing package?

Existing and proposed floor plans, front, rear and side elevations, a 1:1250 OS-based site location plan, a 1:500 block plan, and a planning statement where required. Everything needed for a valid NCC submission — nothing left out.

Do you visit the property before drawing?

Yes — every time. Drawings prepared from photos or estate agent floor plans are a common reason planning applications are queried or refused on receipt by the council.

What's the difference between planning drawings and building regulations?

Planning drawings show what you propose to build — submitted to the council. Building regulations drawings show how it's built — structural details, insulation, drainage. We handle planning drawings; building regs need a structural engineer alongside.

Main street drawign newcastle.png

 /  RELATED SERVICES

PLANNING DRAWINGS

PLANNING DRAWINGS

YOUR PROJECT. 
THIS WEEK.

Send your address or a brief description — get a fixed quote within 24 hours.

Fixed price · No obligation · Newcastle-based

bottom of page